Krones awarded Foodline Projects with the contract to install the new brewhouse at West End Brewery in South Australia. In a world first for Krones and Lion, the brewery stayed functioning without a single hour of lost production time outside of the 7 week shutdown period. During this time, Foodline Projects worked with temporary pipe relocations to ensure vessels could be swapped out without disruption to existing operations. READ CASE STUDY (Malt Handling) / READ CASE STUDY (Cross Flow Filtration) / READ CASE STUDY (Cider Upgrade) / READ CASE STUDY (Brewhouse)